EPSRC Reference: |
GR/L02487/01 |
Title: |
MONITORING AND FINITE ELEMENT ANALYSIS OF HEATHROW T4 SCL STATION TUNNELS |
Principal Investigator: |
Clayton, Professor C |
Other Investigators: |
|
Researcher Co-Investigators: |
|
Project Partners: |
|
Department: |
Civil Engineering |
Organisation: |
University of Surrey |
Scheme: |
Standard Research (Pre-FEC) |
Starts: |
01 March 1996 |
Ends: |
31 December 1998 |
Value (£): |
95,871
|
EPSRC Research Topic Classifications: |
|
EPSRC Industrial Sector Classifications: |
Transport Systems and Vehicles |
|
|
Related Grants: |
|
Panel History: |
|
Summary on Grant Application Form |
This collaborative research between the University of Surrey and British Airports Authority (Heathrow Express) will place extensive data on the performance of two 240m-long, 10m-diameter sprayed concrete lining (SCL) tunnels in the public domain. The data collected during the construction will be used to evaluate the principal commercially-available finite element analysis programmes most widely used in design consultancies, in order to provide objective guidance for industry for use in future SCL tunnel designs.
|
Key Findings |
This information can now be found on Gateway to Research (GtR) http://gtr.rcuk.ac.uk
|
Potential use in non-academic contexts |
This information can now be found on Gateway to Research (GtR) http://gtr.rcuk.ac.uk
|
Impacts |
Description |
This information can now be found on Gateway to Research (GtR) http://gtr.rcuk.ac.uk |
Summary |
|
Date Materialised |
|
|
Sectors submitted by the Researcher |
This information can now be found on Gateway to Research (GtR) http://gtr.rcuk.ac.uk
|
Project URL: |
|
Further Information: |
|
Organisation Website: |
http://www.surrey.ac.uk |