EPSRC Reference: |
GR/R41163/01 |
Title: |
Replacement Cryopump for Leeds Sputtering Facility |
Principal Investigator: |
Hickey, Professor B |
Other Investigators: |
|
Researcher Co-Investigators: |
|
Project Partners: |
|
Department: |
Physics and Astronomy |
Organisation: |
University of Leeds |
Scheme: |
Standard Research (Pre-FEC) |
Starts: |
09 August 2001 |
Ends: |
08 August 2002 |
Value (£): |
16,837
|
EPSRC Research Topic Classifications: |
|
EPSRC Industrial Sector Classifications: |
|
Related Grants: |
|
Panel History: |
|
Summary on Grant Application Form |
The sputtering system at the University of Leeds was developed from an older system originally installed in the late 1980's. The main vacuum pump is aging Varian cryopump, the performance of which has degradede significantly over the past 12 months. In this proposal we are requesting funding to replace this key component of the system in order to be able to continue the substantial EPSRC funded research programmes, both in-house and collaborative, which rely on this important piece of infrastructure.
|
Key Findings |
This information can now be found on Gateway to Research (GtR) http://gtr.rcuk.ac.uk
|
Potential use in non-academic contexts |
This information can now be found on Gateway to Research (GtR) http://gtr.rcuk.ac.uk
|
Impacts |
Description |
This information can now be found on Gateway to Research (GtR) http://gtr.rcuk.ac.uk |
Summary |
|
Date Materialised |
|
|
Sectors submitted by the Researcher |
This information can now be found on Gateway to Research (GtR) http://gtr.rcuk.ac.uk
|
Project URL: |
|
Further Information: |
|
Organisation Website: |
http://www.leeds.ac.uk |