EPSRC logo


Panel Name: Engineering Prioritisation Panel Meeting 22nd April 2015
Date of Panel: 22 April 2015
Panel Contact: Edwards, Janet

Panel Rank Ordered List:  e: Standard Mode - Engineering

RankGrant ReferencePrincipal InvestigatorHolding OrganisationGrant TitleValue (£)
1.
EP/M027856/1
Papageorgiou, Professor LUCLUncertainty-Aware Planning and Scheduling in the Process Industries779,227
1.
EP/M028240/1
Parpas, Dr PImperial College LondonUncertainty-Aware Planning and Scheduling in the Process Industries765,342
2.
EP/M026671/1
Manesiotis, Dr PQueen's University of BelfastApplication of ionic liquid-liquid chromatography (ILLC) to extractions of metals465,413
2.
EP/M02699X/1
Angeli, Professor PUCLApplication of ionic liquid-liquid chromatography (ILLC) to extractions of metals423,929
3.
EP/M026205/1
Parnell, Professor WUniversity of Manchester, TheUltrasonic propagation in complex media: correlated spatial distributions and multiple dispersed phases260,762
3.
EP/M026302/1
Pinfield, Dr VLoughborough UniversityUltrasonic propagation in complex media: correlated spatial distributions and multiple dispersed phases283,997
3.
EP/M026310/1
Povey, Professor MJUniversity of LeedsUltrasonic propagation in complex media: correlated spatial distributions and multiple dispersed phases402,178
4.
EP/M029867/1
Masters, Professor AJUniversity of Manchester, TheRecycling of rare earths with ionic liquid solvents: Bridging the gap between molecular modelling and process design599,506
5.
EP/M028690/1
Choi, Professor KUniversity of NottinghamDeterministic Turbulence632,255
5.
EP/M02878X/1
Gaster, Professor MCity, University of LondonDeterministic Turbulence74,693
5.
EP/M028836/1
Savill, Professor AMCranfield UniversityDeterministic Turbulence282,841
6.
EP/M026345/1
Sangan, Dr CUniversity of BathImproving Turbine Efficiency by Combining the Effects of Rim Seals and End-wall Contours in the Presence of Purge Flow837,467
7.
EP/M024733/1
  Not Funded 
8.
EP/M026299/1
  Not Funded 
9.
EP/M029409/1
  Not Funded 
10.
EP/M025136/1
  Not Funded 
10.
EP/M025225/1
  Not Funded 
11.
EP/M024199/1
  Not Funded 
11.
EP/M025195/1
  Not Funded 
12.
EP/M023966/1
  Not Funded 
12.
EP/M024679/1
  Not Funded 
13.
EP/M026280/1
  Not Funded 
14.
EP/M024113/1
  Not Funded 
14.
EP/M024776/1
  Not Funded 
15.
EP/M024717/1
  Not Funded 
16.
EP/M026612/1
  Not Funded 
17.
EP/M028542/1
  Not Funded 
18.
EP/M027244/1
  Not Funded 
19.
EP/M025446/1
  Not Funded 
19.
EP/M025462/1
  Not Funded 
20.
EP/M027155/1
  Not Funded 
20.
EP/M027945/1
  Not Funded 
21.
EP/M019330/1
  Not Funded 
22.
EP/M026264/1
  Not Funded 
23.
EP/M020606/1
  Not Funded 
24.
EP/M024520/1
  Not Funded 
24.
EP/M024598/1
  Not Funded 
25.
EP/M025861/1
  Not Funded 
26.
EP/M025837/1
  Not Funded 
26.
EP/M025969/1
  Not Funded 
27.
EP/M025799/1
  Not Funded 

Notes:

  1. To maintain the anonymity of applicants, full details are available only for those proposals that have been funded.
  2. The number shown is the rank assigned by the panel at the meeting.
  3. Where proposals have the same number, these are joint proposals that were considered as a single application.
  4. Proposals showing as 'Decision Awaited' are given a rank 'n/a' until the decision has been made, and then the final rank will appear.
Return to the main panel page